We want to express our huge thanks to all the Econ Team who gave up their christmas to help deliver the simultaneous demolition of two railway bridges.
The works consisted of the demolition alongside the install of two bridges with a combined length of over 70m.
Works needed a massive team effort with our clients teams to ensure smooth running of the works due to a very logistically challenging sites in East London.
"Also evident was the pride the staff have in what they do and the care they take to work safely at all times and offer the best service possible to their clients"