We want to express our huge thanks to all the Econ Team who gave up their christmas to help deliver the simultaneous demolition of two railway bridges.
The works consisted of the demolition alongside the install of two bridges with a combined length of over 70m.
Works needed a massive team effort with our clients teams to ensure smooth running of the works due to a very logistically challenging sites in East London.
"I have worked with Econ on many projects within London Underground and Network Rail infrastructure. Econ have always been very proactive in their approach to the projects and have worked collaboratively with my teams from the very early stages. I would definitely recommend them to others"