Bridge demolition; waste and environmental management; site mobilisation and demobilisation; protection of working culvert; road traffic management.
Bank holiday weekend
Econ was commissioned to demolish and clear a concrete footbridge spanning a four lane highway. Timing was critical to ensure that disruption to traffic and local residents was kept to a minimum. Working ‘round the clock’ over a four day weekend period the Econ team successfully demolished and disposed of a large concrete structure in a controlled, efficient and safe operation. A carefully planned convoy approach ensured that all waste material was removed and recycled in the most environmentally friendly way possible.
Careful and detailed planning was essential and the works were overseen and coordinated by one of our highly experienced project managers. Key staff included demolition technicians, and a team of waste removal and recycling operatives. By using our own material recycling facilities and pre-selected and vetted sites we were able to clear a large quantity of waste arising from the demolition over the four day period.
1 x 35t 360 Excavator with a Concrete Cruncher attachment, 3 x 23t 360 Excavators with Breaker and Grab attachments, 1 x 15t 360 Excavator with Selecta Grab attachment and 1 x 360 Telehandler.
Orpington Maintenance Delivery Unit have been utilising Econ’s Services since the commencement of the new Environmental Services contract in October 2021. Since mobilisation Econ have provided our DU with a very efficient and professional service. The customer service and contract team are very friendly and approachable. I use the services of Econ primarily for Non-Emergency call outs which includes both general litter picking and fly tipping jobs as well as larger and more complex waste issues. Every job that I raise is acknowledged and responded to within a quick timescale. Following the completion of each job, I receive a signed completion certificate including photos and detailed commentary. Similarly the period payment reporting is issued on time with full back up information for ease of reference. This enables us to identify jobs and authorise payment quickly. I can strongly recommend the services of Econ who have improved the levels of service previously experienced and assisted our team with the resolution of a number of more difficult and costly cases on our patch.