Redundant rolling stock disposal and recycling
Three year framework agreement
Econ was retained to dismantle and dispose of redundant rolling stock for a number of TfL’s rail subsidiaries, as part of the company’s vital programme of network upgrading and modernisation.
Works were carried out in live working depots so traffic management and careful planning were required to complete the operation without disrupting TfL’s day to day operations.
All contaminants including asbestos and oils were removed and disposed of in an environmentally responsible way. All other materials arising from the project were recycled and several larger sections of rolling stock carefully removed and transported to the London Transport Museum for historic displays to the public.
Working in a railway environment requires a high degree of health and safety knowledge and expertise and the use of suitably qualified and accredited personnel to carry out the works. Econ’s team included staff who met the following requirements: LUL/LUCAS, Depot Track Accustomed Persons, LU/LUA Protection Masters, LUL CCDO, LUL CPCS
22 tonne - 360 Excavator; Skip Lorries
Our Client is extremely pleased at the way we, supported by Econ, have dealt with the situation. From the moment you confirmed that notifiable asbestos was present, a focused, concerted effort has been made by Econ to deal with the problem. The client was impressed at the speed in which Econ tabled a strategic proposal to the HSE to remove the asbestos, working 24/7 non-stop, to expedite the removal. The fact that the proposal, including approval by the HSE, was achieved in such a short timescale is credit to Econ. The proactive approach, while being flexible and accommodating to allow key ECR staff to work in a safe, isolated contained area, has really impressed the Network Rail team.