Asbestos Removal
3 days
Econ were instructed to remove sectional pipe insulation containing asbestos from a toilet block at Railway Station. The works were undertaken over a weekend period. All works were undertaken in fully controlled conditions as the material was licensable. The works were carried out in a full enclosure placed under negative pressure.
We pre-arranged for an ARCA audit to be undertaken on site (as part of our continuing site monitoring regime). This passed with no major or minor non conformities.
1 site supervisor and 3 asbestos operatives. Econ’s team included staff who met the following requirements: Full Category C Asbestos training, CSCS Cards, PASMA and First Aid Training.
Negative pressure unit (2300), Wet Strip Injection Unit, Twin Shower Decontamination Unit, 16 Yard Asbestos Skip.
"I have worked with Econ on many projects within London Underground and Network Rail infrastructure. Econ have always been very proactive in their approach to the projects and have worked collaboratively with my teams from the very early stages. I would definitely recommend them to others"