Services

Dismantling of existing cycle footbridge

Project duration

1 x 12 hour possession

Summary

Econ was contracted on behalf of Network Rail for the dismantling of the ramp section and main span of the existing cycle footbridge in close proximity to Feltham railway station.

The works consisted of careful planning to ensure it was carried out during a 12 hour possession of the track, using a Kirow rail mounted crane to assist dismantling of the footbridge, which was over 30 meters in length and weighing 25 tonnes. The main span was lifted into a laydown area and was then cut into 10 meter sections, using oxy propane cutting equipment so it could be transported to another location using articulated flatbed vehicles. The sections were then lifted off the transport using a 60 tonne mobile crane and stored in the Network Rail yard.

Staffing requirements

2 x Demolition managers, 2 x Demolition managers, 2 x hot cutting operatives, 6 x demolition operatives. Econ’s team included staff who met the following requirements: CCDO certification, PTS certification, Safety in gas cutting and CPCS D90 certification (demolition plant).

Equipment/Plant Used

1 x rail mounted kirow crane, 1 x 60 tonne mobile crane, 4 x articulated flatbed vehicles, 1 x roll on off vehicle and 1 x 20 tonne demolition excavator.

Similar Case Studies

Our Client is extremely pleased at the way we, supported by Econ, have dealt with the situation. From the moment you confirmed that notifiable asbestos was present, a focused, concerted effort has been made by Econ to deal with the problem. The client was impressed at the speed in which Econ tabled a strategic proposal to the HSE to remove the asbestos, working 24/7 non-stop, to expedite the removal. The fact that the proposal, including approval by the HSE, was achieved in such a short timescale is credit to Econ. The proactive approach, while being flexible and accommodating to allow key ECR staff to work in a safe, isolated contained area, has really impressed the Network Rail team.

Network Rail - Rail & Asbestos Removal

Network Rail

Our Accreditations

Enabling
Teamwork
Enabling
Health & Safety
Enabling
Excellence
Enabling
Growth

Subscribe to our Newsletter!

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.