Demolition
Three Weeks
Econ Construction were commissioned to carry out the demolition of FM Conway’s former office in Dartford, Kent.
The structure to be demolished was steel frame construction with brick infill and concrete hollow pot roof. The demolition was undertaken with great care and attention as the structure was connected to adjoining structures that had to remain operational.
This was achieved using diamond sawing and hand demolition to separate the structures before completing the demolition using mechanical demolition excavators.
The project was completed to budget and programme with no reportable incidents throughout the works.
ARCA Trained Asbestos Managers through to Operatives, Econ’s team included staff who met the following requirements: Emergency First Aid, IPAF, CPCS, CSCS
1 X 20 tonne excavator, skip lorry, hand tools and diamond drilling equipment.
"I have worked with Econ on many projects within London Underground and Network Rail infrastructure. Econ have always been very proactive in their approach to the projects and have worked collaboratively with my teams from the very early stages. I would definitely recommend them to others"